Check the Status of your Jeep JK Wrangler - Order Status Codes
#1961
howdy...first time, long time.
Ordered my Rubi last month. Spoke to DC today and they said I was in BG with a material restriction but she didn't know exactly what material was holding things up.
pulling up a chair...
Ordered my Rubi last month. Spoke to DC today and they said I was in BG with a material restriction but she didn't know exactly what material was holding things up.
pulling up a chair...
#1963
#1966
JK Enthusiast
Join Date: Aug 2007
Location: Jacksonville, FL
Posts: 149
Likes: 0
Received 0 Likes
on
0 Posts
#1969
JK Enthusiast
Join Date: Aug 2007
Location: Peachtree City, GA (Atlanta area)
Posts: 458
Likes: 0
Received 0 Likes
on
0 Posts
New to the site and can't read all 203 pages. Mid July I ordered an '08 Sahara Unlimited 4WD 6-Speed. It is in JS status. No VIN yet. It was Est to ship this past Sat. but guess not. Talked to rep yetserday, and still nothing new. Any ideas??
#1970
JK Junkie
found this on the netaimlerChrysler Order Status Codes
Unscheduled
BX – good order, available for scheduling
BB – fleet order only – review by Bid Department
BD – special equipment processing
BE – edit error – coding error which must be corrected before the order can be considered for scheduling
BG – order has passed edit but cannot be considered for scheduling
BG F – finance hold – automatic cancellation after 15 days
BG B – model or option hold
BG B – build out hold
BG L – material restriction hold
BG M – material hold (fleet)
ZA – cancelled order
Scheduled
C – tentative schedule
D – firm schedule: serial number is assigned.
D1 – gateline: plant has sequenced the unit for production, estimated ship date assigned
D2 – gateline: framing and build imminent, usually within 3-6 days
Note: Once a vehicle reaches scheduled (C or D) status, it cannot be cancelled by the dealer. Orders can sit in D-status for up to 60 days.
Build
E – framing
F – paint
G – trim
Built
I – unit is pending final inspection
J – vehicle has passed final inspection, but has not been released to carrier
JB – shipped to body vendor
JE – shipped to emissions
JJ – consigned body vendor
JS – shipped to storage
KZ – released by plant and invoiced
Note: Vehicles must reach KZ-status before an invoice can be generated.
Traffic Codes
KZ L – released but not shipped
KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ OA – plant hold, quality audit
KZ OB – zone or dealer hold, sales hold, vehicle prep hold, tax hold, finance hold, dealer refusal, diversion hold, vehicle diverted, derailment hold
KZ OC – carrier delay hold, rail car shortage, bad load, insufficient load, inclement weather, need shipping order, manifest error, strike-bound hold, emission or safety hold.
KZ OD – mechanical failure, glass damage, vehicle lacking parts, vehicle in repair, storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH – all other carrier codes that currently post an “O” delay code that are not included above
KZ R – vehicle within a few days of arrival to dealer
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
KZ Y2 – major damage – vehicle sold at auction
--------------------------------------------------------------------------------
Unscheduled
BX – good order, available for scheduling
BB – fleet order only – review by Bid Department
BD – special equipment processing
BE – edit error – coding error which must be corrected before the order can be considered for scheduling
BG – order has passed edit but cannot be considered for scheduling
BG F – finance hold – automatic cancellation after 15 days
BG B – model or option hold
BG B – build out hold
BG L – material restriction hold
BG M – material hold (fleet)
ZA – cancelled order
Scheduled
C – tentative schedule
D – firm schedule: serial number is assigned.
D1 – gateline: plant has sequenced the unit for production, estimated ship date assigned
D2 – gateline: framing and build imminent, usually within 3-6 days
Note: Once a vehicle reaches scheduled (C or D) status, it cannot be cancelled by the dealer. Orders can sit in D-status for up to 60 days.
Build
E – framing
F – paint
G – trim
Built
I – unit is pending final inspection
J – vehicle has passed final inspection, but has not been released to carrier
JB – shipped to body vendor
JE – shipped to emissions
JJ – consigned body vendor
JS – shipped to storage
KZ – released by plant and invoiced
Note: Vehicles must reach KZ-status before an invoice can be generated.
Traffic Codes
KZ L – released but not shipped
KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ OA – plant hold, quality audit
KZ OB – zone or dealer hold, sales hold, vehicle prep hold, tax hold, finance hold, dealer refusal, diversion hold, vehicle diverted, derailment hold
KZ OC – carrier delay hold, rail car shortage, bad load, insufficient load, inclement weather, need shipping order, manifest error, strike-bound hold, emission or safety hold.
KZ OD – mechanical failure, glass damage, vehicle lacking parts, vehicle in repair, storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH – all other carrier codes that currently post an “O” delay code that are not included above
KZ R – vehicle within a few days of arrival to dealer
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
KZ Y2 – major damage – vehicle sold at auction
--------------------------------------------------------------------------------