Official JK BUGGY by CAROLINA TRUGGIES build THREAD 8/4/08
#702
JK Super Freak
Thread Starter
Join Date: Jan 2008
Location: Mint Hill, NC
Posts: 1,412
Likes: 0
Received 0 Likes
on
0 Posts
I already have insurance on the Jeep with an additional $50,000 coverage for the work in it, Gieco didn't have a problem with this with receipt's in tact for all the additional coverage...our rates aren't ridiculous either
#704
JK Super Freak
Thread Starter
Join Date: Jan 2008
Location: Mint Hill, NC
Posts: 1,412
Likes: 0
Received 0 Likes
on
0 Posts
got some steering to finish and some fuel lines to run then she's ready to roll, then exhaust and she's ready for inspection, the rest is for protection and looks ...dead line to be operational is May 14-16, we've entered her in a Jeep event
#705
JK Super Freak
Join Date: Apr 2009
Location: DALLAS, TX
Posts: 1,022
Likes: 0
Received 0 Likes
on
0 Posts
great news! been watching this build for toooooo long man
#707
JK Super Freak
Thread Starter
Join Date: Jan 2008
Location: Mint Hill, NC
Posts: 1,412
Likes: 0
Received 0 Likes
on
0 Posts
#709
JK Super Freak
Thread Starter
Join Date: Jan 2008
Location: Mint Hill, NC
Posts: 1,412
Likes: 0
Received 0 Likes
on
0 Posts
I haven't scene these light up in quite a while
SPARE TIRE WILL NOT BE MOUNTED HERE...JUST THERE FOR THE WEIGHT TO ADJUST THE COILOVERS
Custom fuel cell done, coilovers filled with nitrogen, brakes done, hydraulic lines started, ebrakes fabed, final paint applied, floor board filled in, front and rear driveshafts installed, ORO Rock lites wired, tail lights/turn signals wired, most of the sound system installed....etc etc....we need to be running by the end of next week
SPARE TIRE WILL NOT BE MOUNTED HERE...JUST THERE FOR THE WEIGHT TO ADJUST THE COILOVERS
Custom fuel cell done, coilovers filled with nitrogen, brakes done, hydraulic lines started, ebrakes fabed, final paint applied, floor board filled in, front and rear driveshafts installed, ORO Rock lites wired, tail lights/turn signals wired, most of the sound system installed....etc etc....we need to be running by the end of next week